Function

Function

If you are using project stages, at the start of a project, a project stage should be indicated in the Project stage field.

The stage can be continuously changed by selecting the appropriate state and clicking Update. Each time the project changes stages, TimeLog logs the time of the change, as well as who made the change.

If you update the status to a status that “leapfrogs” over another status, such as changing the status from Idea to Completed, the date is also entered for the stages in between.

If you set the project’s status back to an earlier status, the date stamp is removed for all the statuses that take place after the new, current status. If the project goes, for example, from Execution to Idea, the date stamp is wiped out from the Execution, and Planning status.

When you click the button next to the project status box, the dates displayed indicate when the project was switched to a specific status. The dates can be edited, so that even if the project status was changed at a later time, you can change the date to the time when the status was actually changed.

Last updated 2/7/2018